Please use this identifier to cite or link to this item: https://cris.library.msu.ac.zw//handle/11408/4897
Title: Kinematics and Discreet Modelling for Ramp Intersections: Proceedings of EUROCK 2018 – the (International Society for Rock Mechanics) ISRM European Rock Mechanics Symposium: Geomechanics and geodynamics of rock masses. 22 – 26 May 2018. Saint-Petersburg, Russia.
Authors: Zvarivadza, T.
Sengani, F.
Keywords: ramp intersections
Discreet Modelling
Kinematics
excavation orientations
Gold mines
Issue Date: 2018
Abstract: Geotechnical work was conducted in order to identify the required support length and other important parameters in ramp intersections at a deep level gold mine. The investigation included detailed scanline and joint mapping. Discreet models were constructed and eight different excavation orientations were analyzed in order to obtain a worst case scenario of mining direction. A sensitivity analysis was conducted and the effect of clamping stresses on the hanging wall was quantified. The probabilistic modeling program, JBlock, was utilized to quantify the probable maximum apex height of blocks forming in the ramp intersections. A geo-domain was constructed making use of all the data acquired and was analyzed. Eight excavations were constructed ranging in mining directions from 0 to 315 degrees. The excavations were assumed to have a dip of 8 degrees to ensure the largest blocks are created, subsequently catering for the worst case scenario. The output data created by the software was scrutinized for failed blocks, and cumulative distribution graphs created. In order to understand the effect of clamping stresses in the hanging wall, the worst case mining direction (180 degrees) was utilized and clamping stresses in the hanging wall were varied from 0 kPa to 30 kPa. A 32% reduction in the 50 percentile apex height was attained when the clamping stress increased to 5 kPa, a 43% reduction was attained when a clamping stress of 10 kPa was applied, and a 48% reduction in apex height was attained when the clamping stress was set to 30 kPa.
URI: https://onepetro.org/ISRMEUROCK/proceedings-abstract/EUROCK18/All-EUROCK18/ISRM-EUROCK-2018-133/446999
http://hdl.handle.net/11408/4897
Appears in Collections:Conference Papers

Files in This Item:
File Description SizeFormat 
Kinematics and Discreet Modelling for Ramp Intersections.pdfAbstract59.24 kBAdobe PDFView/Open
Show full item record

Page view(s)

8
checked on May 1, 2024

Download(s)

8
checked on May 1, 2024

Google ScholarTM

Check


Items in MSUIR are protected by copyright, with all rights reserved, unless otherwise indicated.